Rebuilding a volumetric filler

A team restored a stopped Masterfil filling machine whose original control program and documentation were unavailable.

Founder’s experience on a team retrofit

Engineering challenge

The team had to reconstruct the fill sequence from the machine itself.

Technical solution

Ameed programmed the replacement PLC, developed the operator screens, contributed most of the electrical redesign and helped commission the filler.

Implementation

Festo pneumatics moved the filling hardware. The new controls supported bottom filling, flushing and manual jogging. The HMI explained why an interlock had blocked a movement.

Outcome

The team returned the filler to operation with adjustable filling and cleaning modes.